Thursday, 4 April 2013
Friday, 22 March 2013
Production Log #28 (8/02/2013) - Finishing up
Today I completed my magazine. I added the final article and uploaded it to ISSUU.COM for hosting. Now I will work on completeing my evaluations and the rest of my blog posts. Everything is due in on Monday 11th March 2013 so I'd better get working.
Sunday, 10 March 2013
Friday, 8 March 2013
Friday, 1 March 2013
Production Log #27 (1/03/2013) - Wrapping up my magazine
In today's lesson, I've added the finishing touches to my front cover. I used Adobe InDesign CS6 and Adobe Photoshop CS6 to finish pictures and add them in.
All I have left to do now is to finish the main article and then I'm done!
All I have left to do now is to finish the main article and then I'm done!
Friday, 22 February 2013
Friday, 15 February 2013
Wednesday, 13 February 2013
Friday, 8 February 2013
Friday, 1 February 2013
Friday, 25 January 2013
Production Log #22 (25/1/2013) - Video Feedback
Today I filmed my video feedback with Ciaran. I got him to speak on camera about my magazine and I asked him to compare it to a copy of NME that I borrowed from the school. After Ciaran spoke about the improvements and positive points about my magazine I spoke to the camera about his. The video feedback is a good way to get an idea of what my target demographic think about my magazine ( even though it's unfinished).
Sunday, 20 January 2013
Friday, 18 January 2013
Friday, 11 January 2013
Production Log #20 (11/1/2013) - NME
These are some NME covers I have gathered that I might want to draw ideas from:
Friday, 4 January 2013
Production Log #19 (4/1/2013) - Kerrang!
These are some Kerrang! covers that I am considering drawing ideas from:
Subscribe to:
Posts (Atom)